Fritsch PULVERISETTE 6 classic line User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
GTM-System page 14
With „CHECK IN“ you are being reminded to pull the plug out
of the transmitter unit. Doing so will activate it and the data
transfer to the receiver will commence.
The receipt of the measuring data will be indicated by the yel-
low LED on the receiver (yellow indication will change the
switch position at intervals, depending on configuration).
Setting of speed and milling time, container with transmitter
unit fit into the container mounting.
Start of measuring: As soon as the CHECK IN has occurred,
the data transfer will commence. By use of the button Start
Measuring (arrow) the recording will be deleted and com-
mence newly.
Start the mill
Pay attention to the operating manual of the mill!
Check temperature of the transmitter unit. Do not excee tempera-
tures of more than 70°C. If necessary, stop to let it cool off.
If the temperature of the transmitter unit is to high the GTM program
reports "temperature on broadcast-unit exceeded".
Tip:
With swift energy-releases in the grinding-bowl, one reaches a limited
refrigeration of the bowl and the transmitter, which are cooled by air of
the rotating mill.
Supervise reception of the measure data on the Receiver or
the PC. Due to ball-hit-movements, the measurement can
fluctuate in limited intervals and consequently short-term
cause more intensive transmission of the measuring values.
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 25 26

Comments to this Manuals

No comments