Fritsch PULVERISETTE 6 classic line User Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
GTM-System page 12
3 Execution of Measurement
3.1 Filters
Loosen the two slotted screws (under the transmitter unit).
Remove plate
Place filters (after delivery, a filter is already in place)
Tighten screws of plate
Use the transmitter unit only with a filter.
Generally, change the filter if you us different materials when com-
minuting.
Check the filter after each measurement and change it if necessary.
3.2 Execution of Measurement
1. Test:
Start-up switches of the transmitter unit.
condition of the accumulator (full/empty)
Filter
Connections on transmitter unit
2. Fill grinding-bowl
(see instruction manual of the mill!)
3. Check the gasket of the grinding bowl
(change if damaged)
4. Screw transmitter unit onto grinding bowl (4 screws)
5. Put grinding bowl in the mill
6. To tighten the grinding bowl please follow the instruc-
tion manual of the mill!
Caution!!
The planetary mill is not to be loaded unbalanced, the load-
ing has always to be effected symmetrically, which means
that the total weight of the GTM II system, the grinding balls
and the sample absolutely needs to be the same than the
counterweight.
Suggestions for the mass balance
volume of
the grinding
bowl „GTM
II“
(ml)
material weight without
grinding balls
and sample
(gr)
250
stainless
steel
3500
500
stainless
steel
5175
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 25 26

Comments to this Manuals

No comments